| November 2025

Integrated, robust and resilient planning of energy infrastructures as part of the system development strategy

Final report commissioned by the Federal Ministry for Economic Affairs and Energy. Prepared in cooperation with BET Consulting, IKEM and Fraunhofer IEG.
Download: 
External links: 

Abstract

This study documents the key findings and recommendations of the project of the same name. Based on an analysis of the status quo of infrastructure planning processes, the aim of the project was to identify relevant areas in need of adjustment in the planning of energy infrastructures and to develop recommendations in this regard. The system development strategy (SES) is a central control instrument in this context that is now also enshrined in law. A particular focus of the project was therefore on the question of how and, if applicable, with which further developments the SES can contribute to more integrated or robust and resilient planning.

Related projects

Interplan SES

In Interplan SES, IKEM is developing strategies to reduce uncertainties in the planning of energy infrastructures.

IKEM-Author(s)

Further information

Suggested citation:
Consentec: Integrated, robust and resilient planning of energy infrastructures as part of the system development strategy. Final report commissioned by the Federal Ministry for Economic Affairs and Energy. Prepared in cooperation with BET Consulting, IKEM and Fraunhofer IEG. 2025.
Join us at
IKEM and EUETH will be hosting a series of side events at this year’s climate negotiations to discuss the energy-climate-defense nexus, the reconstruction of Ukraine’s energy system, and nature-based solutions for climate mitigation.